{"id":28793,"date":"2026-05-26T09:07:35","date_gmt":"2026-05-26T09:07:35","guid":{"rendered":"https:\/\/www.pta.es\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/"},"modified":"2026-05-26T09:07:35","modified_gmt":"2026-05-26T09:07:35","slug":"the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million","status":"publish","type":"post","link":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/","title":{"rendered":"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million"},"content":{"rendered":"<ul>\n<li><strong>Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&amp;D infrastructures<\/strong><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The strategic imec project at<\/span><a href=\"https:\/\/www.pta.es\/en\/\"> <span style=\"font-weight: 400;\">M\u00e1laga TechPark<\/span><\/a><span style=\"font-weight: 400;\"> continues to make decisive progress toward its launch. The Ministry for Digital Transformation and the Civil Service has formalised the award of contracts for the future semiconductor research and prototyping centre that the Belgian institute will develop at M\u00e1laga TechPark, with a total investment exceeding \u20ac168 million.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project involves the construction of a cutting-edge technology complex focused on the design and development of state-of-the-art chips. The infrastructure is intended to strengthen the position of M\u00e1laga and Spain within the European microelectronics ecosystem.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The main contract, valued at \u20ac163.4 million, was awarded to the Joint Venture (JV) formed by Sando, OHLA and Itercon, which will be responsible for constructing the buildings and infrastructure that will make up the future centre. Meanwhile, the Render Industrial Group will oversee the construction of the complex\u2019s power plant under a \u20ac4.9 million contract.<\/span><\/p>\n<p><b>A Strategic Infrastructure for Europe<\/b><\/p>\n<p><a href=\"https:\/\/www.imec-int.com\/en\"><span style=\"font-weight: 400;\">Imec<\/span><\/a><span style=\"font-weight: 400;\">\u2019s future headquarters at M\u00e1laga TechPark will host Spain\u2019s first advanced 300-millimetre semiconductor R&amp;D facility. Its main features will include an approximately 2,000-square-metre clean room, more than 60 pieces of advanced processing equipment, and specialised spaces for research, testing and prototyping.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project is part of the PERTE Chip programme promoted by the Government of Spain and will involve a total investment of more than \u20ac600 million, including contributions from the Central Government, the Regional Government of Andalusia, and the M\u00e1laga City Council, which is supporting the initiative through the transfer of land and administrative facilitation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The centre\u2019s activity will focus on the creation of advanced microchip prototypes for strategic sectors such as medicine, photonics, artificial intelligence, quantum computing and advanced industrial technologies.<\/span><\/p>\n<p><b>M\u00e1laga TechPark Strengthens Its Leadership in Microelectronics<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The arrival of imec represents one of the most significant milestones in M\u00e1laga TechPark\u2019s recent evolution and further consolidates the growth of the technology ecosystem linked to microelectronics and deep-tech industries in Southern Europe.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In addition to the manufacturing clean room, the infrastructure will include office buildings, central services, technical platforms, energy facilities and specialised logistics spaces, as well as green areas, internal roads and mobility-related infrastructure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">According to current forecasts, construction could begin between the end of this year and early 2027, with completion expected in 2028. Afterwards, the installation and validation of the scientific and technological equipment required for the centre\u2019s operations will take place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project update comes just weeks after the official establishment of the imec Spain Foundation, the entity that will oversee the Belgian institute\u2019s activities in Spain and which is already registered in the State Registry of Foundations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Through this new infrastructure, M\u00e1laga TechPark continues to strengthen its ability to attract international investment, highly qualified talent and high-impact technology projects related to industries that will shape Europe\u2019s future.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&amp;D infrastructures The strategic imec project at M\u00e1laga TechPark continues to make decisive progress toward its launch. The Ministry for Digital Transformation and the Civil Service has formalised the award of contracts for the future semiconductor research&#8230;<\/p>\n","protected":false},"author":2,"featured_media":28792,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[122],"tags":[],"class_list":["post-28793","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million | Parque Tecnol\u00f3gico de Andaluc\u00eda<\/title>\n<meta name=\"description\" content=\"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&amp;D infrastructures\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Future imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million\" \/>\n<meta property=\"og:description\" content=\"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&amp;D infrastructures\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/\" \/>\n<meta property=\"og:site_name\" content=\"Parque Tecnol\u00f3gico de Andaluc\u00eda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ptamalaga\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-26T09:07:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec-960x300.jpg\" \/>\n<meta name=\"author\" content=\"PTA\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@PTAMalaga\" \/>\n<meta name=\"twitter:site\" content=\"@PTAMalaga\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"PTA\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/\"},\"author\":{\"name\":\"PTA\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#\\\/schema\\\/person\\\/c11d23e49794c2aeaa7269cd208186dd\"},\"headline\":\"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million\",\"datePublished\":\"2026-05-26T09:07:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/\"},\"wordCount\":509,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/imec.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/\",\"url\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/\",\"name\":\"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million | Parque Tecnol\u00f3gico de Andaluc\u00eda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/imec.jpg\",\"datePublished\":\"2026-05-26T09:07:35+00:00\",\"description\":\"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&D infrastructures\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/imec.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/imec.jpg\",\"width\":960,\"height\":523,\"caption\":\"imec M\u00e1laga TechPark: construction contract awarded worth \u20ac168 million\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/noticias\\\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.pta.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pta.es\\\/en\\\/\",\"name\":\"Parque tecnol\u00f3gico de Andaluc\u00eda\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pta.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#organization\",\"name\":\"M\u00e1laga TechPark\",\"alternateName\":\"Parque Tecnol\u00f3gico de Andaluc\u00eda\",\"url\":\"https:\\\/\\\/www.pta.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/logo-pta.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pta.es\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/logo-pta.jpg\",\"width\":145,\"height\":59,\"caption\":\"M\u00e1laga TechPark\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ptamalaga\\\/\",\"https:\\\/\\\/x.com\\\/PTAMalaga\",\"https:\\\/\\\/www.instagram.com\\\/ptamalaga\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/parque-tecnol-gico-de-andaluc-a-pta-\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pta.es\\\/en\\\/#\\\/schema\\\/person\\\/c11d23e49794c2aeaa7269cd208186dd\",\"name\":\"PTA\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g\",\"caption\":\"PTA\"},\"sameAs\":[\"https:\\\/\\\/www.pta.es\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million | Parque Tecnol\u00f3gico de Andaluc\u00eda","description":"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&D infrastructures","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/","og_locale":"en_US","og_type":"article","og_title":"The Future imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million","og_description":"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&D infrastructures","og_url":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/","og_site_name":"Parque Tecnol\u00f3gico de Andaluc\u00eda","article_publisher":"https:\/\/www.facebook.com\/ptamalaga\/","article_published_time":"2026-05-26T09:07:35+00:00","og_image":[{"url":"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec-960x300.jpg","type":"","width":"","height":""}],"author":"PTA","twitter_card":"summary_large_image","twitter_creator":"@PTAMalaga","twitter_site":"@PTAMalaga","twitter_misc":{"Written by":"PTA","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#article","isPartOf":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/"},"author":{"name":"PTA","@id":"https:\/\/www.pta.es\/en\/#\/schema\/person\/c11d23e49794c2aeaa7269cd208186dd"},"headline":"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million","datePublished":"2026-05-26T09:07:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/"},"wordCount":509,"publisher":{"@id":"https:\/\/www.pta.es\/en\/#organization"},"image":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/","url":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/","name":"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million | Parque Tecnol\u00f3gico de Andaluc\u00eda","isPartOf":{"@id":"https:\/\/www.pta.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#primaryimage"},"image":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec.jpg","datePublished":"2026-05-26T09:07:35+00:00","description":"Thanks to the imec project, M\u00e1laga TechPark will become the headquarters of one of Europe\u2019s most advanced semiconductor R&D infrastructures","breadcrumb":{"@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#primaryimage","url":"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec.jpg","contentUrl":"https:\/\/www.pta.es\/wp-content\/uploads\/2026\/05\/imec.jpg","width":960,"height":523,"caption":"imec M\u00e1laga TechPark: construction contract awarded worth \u20ac168 million"},{"@type":"BreadcrumbList","@id":"https:\/\/www.pta.es\/en\/noticias\/the-future-imec-centre-at-malaga-techpark-moves-forward-with-the-award-of-contracts-worth-more-than-e168-million\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.pta.es\/en\/"},{"@type":"ListItem","position":2,"name":"The Future Imec Centre at M\u00e1laga TechPark Moves Forward with the Award of Contracts Worth More Than \u20ac168 Million"}]},{"@type":"WebSite","@id":"https:\/\/www.pta.es\/en\/#website","url":"https:\/\/www.pta.es\/en\/","name":"Parque tecnol\u00f3gico de Andaluc\u00eda","description":"","publisher":{"@id":"https:\/\/www.pta.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pta.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pta.es\/en\/#organization","name":"M\u00e1laga TechPark","alternateName":"Parque Tecnol\u00f3gico de Andaluc\u00eda","url":"https:\/\/www.pta.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pta.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.pta.es\/wp-content\/uploads\/2020\/03\/logo-pta.jpg","contentUrl":"https:\/\/www.pta.es\/wp-content\/uploads\/2020\/03\/logo-pta.jpg","width":145,"height":59,"caption":"M\u00e1laga TechPark"},"image":{"@id":"https:\/\/www.pta.es\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ptamalaga\/","https:\/\/x.com\/PTAMalaga","https:\/\/www.instagram.com\/ptamalaga\/","https:\/\/www.linkedin.com\/company\/parque-tecnol-gico-de-andaluc-a-pta-\/"]},{"@type":"Person","@id":"https:\/\/www.pta.es\/en\/#\/schema\/person\/c11d23e49794c2aeaa7269cd208186dd","name":"PTA","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5e6e65c76d2a26aecbe1497af18c01a6a11a3b8db3995ec80a5c5cbb35f79026?s=96&d=mm&r=g","caption":"PTA"},"sameAs":["https:\/\/www.pta.es"]}]}},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/posts\/28793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/comments?post=28793"}],"version-history":[{"count":0,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/posts\/28793\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/media\/28792"}],"wp:attachment":[{"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/media?parent=28793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/categories?post=28793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pta.es\/en\/wp-json\/wp\/v2\/tags?post=28793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}